Product Details:
| Minimum Order Quantity | 1 Project |
| Plant Type | Grinding unit |
| Plant Capacity | 2000–5000 TPD |
| Service Scope | Feasibility report, Optimization, Turnkey project, Process design, Performance audit |
| Technology | Wet process, VRM grinding, Dry process, Semi dry, Ball mill grinding |
| Automation Grade | Automatic |
| Fuel Type | Gas, Waste fuel, Pet coke, Lignite, Coal |
| Consulting Mode | Onsite |
| Project Stage | Greenfield |
| Environmental | Water management, Energy audit, Emission control, WHR system |
| Product Type | Composite, PSC, PPC, OPC, White cement |
| Voltage V | v |
| I Deal In | New and Second Hand |
| Country of Origin | Made in India |
|
From concept to commissioning, from basic engineering to detailed project engineering, from basic idea to a wonderful reality, we deliver customized solutions to small, medium and large enterprises |
|
| 1 | Techno-Economical : |
|
Which includes the selection of viable capacity of Project , feasibility study and preparation of feasibility report. |
|
| 2 | Detailed Project Report : |
|
Includes Plant Layout, Process & Instrumentation flow diagram, technical specification of machinery. |
|
| 3 | Detailed Engineering : |
|
With finalization of Plant layout, preparation of G.A drawing, section wise drawings, finalization of equipment specifications, instrument and process control equipment specifications etc |
|
| 4 | Project Work : |
|
Includes preparation of schedule for the Project, to float Tender enquiries to various Plants / Machinery Manufacturers, Techno-Commercial discussions with vendors for finalization of machinery and bought out items, co-ordinate with suppliers to complete project in time. Inspection of equipments manufactured by the supplier and to monitor progress. |
|
| 5 | Inspection & Approval : |
|
Stage Inspection during manufacturing of Plant & Machinery & pre-shipment (load & no load inspection & certification). |
|
| 6 | Supervision of Erection : |
|
Includes assistance in erection & trial runs of plants machinery & commissioning of plants & performance trial. |
|
| 7 | Operational Management |
|
Plant maintenance, trouble shooting, performance improvement, production optimization, man power planning, inventory control, modernization of existing plants for better performance and energy saving. |
|
Additional Information:
Product Details:
| Service Location | Pan India |
| Project Duration | 1-2 Days |
| Mode of Service | Offline |